Add a service price

How much does electrical installation cost?

Electrical installation: half of the collected sources fall within 145 ‑ 175 PLN/point, and the middle value (median) is 170 PLN/point. Comparison based on 3 sources, as at 28 September 2026.

all prices
Price filters
Provided by
Verification
Rating
Period
Company size

Figures on this page:all prices

Median
170 PLN/point
Typical (middle half of sources)
145 ‑ 175 PLN/point
Full range in sources
100 ‑ 250 PLN/point
Sources
3 · confidence average

Unit: PLN per electrical point (labour, socket or switch). Prices stated in public price lists and guides, not confirmed by invoices. How we calculate them.

Prices by source

‘from-to’ price rangemedian

Hover over the bar (or tap it) to see the price and its source.

Electrical installation: prices by source

Five sources with varying levels of reliability, deliberately kept separate so that declarations are not mixed with evidence. The price index consists of cited public price lists per unit of service (PLN/point); customer reviews show amounts for entire jobs submitted via the ‘How much did you pay?’ form, with three verification levels (how we verify them); company price lists contain prices entered by the companies themselves. Price index as at: 28 September 2026; customer and company entries are updated continuously.

SourceMedianTypical range / full rangeNumber
Price index: quoted public price lists and guidesevery price from a public website, with a quotation, date and link; median of range midpoints, excluding outliers170 PLN/point145 ‑ 1753
Customer reviews verified with an invoice or receiptthe editorial team (initially assisted by AI) checked the document: the service, amount, date and contractor all match--0
Customer reviews verified by declaration (confirmed by e-mail)the author confirmed through an e-mail link their declaration that they had used the service and that the amount and review were genuine--0
Unverified customer reviewsamount submitted through the form without confirmation by e-mail or document--0
Price lists entered by companies (company declarations)gross prices entered by companies using the company form; we do not verify them or include them in the price index median--0

At a glance. According to the price index (cited public price lists), Electrical installation costs typically 145 ‑ 175 PLN/point,median 170 PLN/point, based on 3 sources, as at 28 September 2026.

We do not yet have customer reviews verified with an invoice or receipt for this service.

We do not yet have customer reviews verified by declaration (confirmed by e-mail) for this service.

We do not yet have unverified customer reviews for this service.

No company has yet added its own price list for this service.

Source for citation: indekscen.pl, ‘Electrical installation’, as at 28 September 2026, https://indekscen.pl/en/ile-kosztuje/instalacja-elektryczna/. Method: how we calculate, how we verify. Data description for AI assistants: llms.txt.

Options and additional fees

OptionPriceSources
complete electrical installation in a new detached house (approx. 100-150 m²)14,000 ‑ 20,000 PLN/housegrupa-elektro.pl

What affects the price

  • city (rates are higher in Warsaw and other large cities, e.g. PLN 100-130/hour, than in smaller cities, PLN 60-85/hour)
  • number of electrical points and complexity of the installation
  • type of point: socket, switch, lighting point or three-phase power point have different rates
  • condition of the substrate and the need for wall chasing
  • additional scope: electrical measurements and reports (SEP D)

Usually included in the price

  • labour for installing an electrical point (socket, switch, lighting)
  • materials (cables and accessories) in some offers

Usually charged separately

  • electrical installation design (separate charge of PLN 700-1300)
  • electrical measurements and reports (charged separately)
  • service call-out (PLN 30-80)

Rates vary considerably between cities and depend on whether they are charged per point or per labour hour (PLN 60-150/hour in 2026).

Prices from customers and companies

Two types of entries: customers state how much they paid for the entire job and rate the contractor; service providers enter their price lists. Customer entries have three reliability levels: ✓ verified: invoice or receipt (the editorial team has seen a document matching the entry), ✓ verified: declaration (the author confirmed the entry using a link sent by e-mail) and unverified (how we verify entries); we do not verify company price lists. Price lists entered by companies are not included in the median at the top of the page; customer amounts are included only for services priced as a complete service.

Loading entries…

Add your price and review Add your company's price list (free of charge)

Contractors: electrical installation

Companies with a public price list for this service, based on our sources, and providers named by customers in reviews. The order is not a ranking; we do not charge for inclusion in the list.

ContractorHow we knowPriceCustomer rating
abc-budowania.pl · Warszawaprice list on the company or facility website119 ‑ 219 PLN/point-

Price sources

Each amount comes from a publicly accessible website. The quote is the passage containing the amount. Website data as at 28 September 2026; prices may have changed since then.

SourceTypeCityPrice (PLN/point)
wycenapp.pl · 2026„Punkt elektryczny gniazdo | 100-150 zł”guide / portalall of Poland100 ‑ 150
pomoc-instalacja.pl · 2026„Typowe stawki za jeden punkt elektryczny kształtują się następująco: gniazdo od 120 do 250 zł, włącznik od 80 do 180 zł, punkt oświetleniowy od 100 do 200 zł.”gniazdko; włącznik 80-180 zł, punkt oświetleniowy 100-200 złguide / portalall of Poland120 ‑ 250
abc-budowania.pl · 2026-08„Średni koszt robocizny w Warszawie wynosi od 119 do 219 zł/punkt (stawka średnia: 163 zł/punkt ).”średnio 163 zł za punktcompany price listWarszawa119 ‑ 219

Questions about the price

How much does an electrician charge to connect cables?

An electrician's rate in Poland is usually PLN 60 to 150 per labour hour, depending on the city, experience and specialisation.

How much does a complete electrical installation in a house cost?

For a 100-150 m² house, a complete electrical installation (labour and materials, around 80 points) usually costs PLN 14 000 to 20 000.

How much does the electrical installation in a 120 m2 house cost?

For a house of around 120-150 m², a complete electrical installation usually costs PLN 14 000-20 000 for labour and materials.

How much does it cost to install a socket and switch?

Installing a power point with a socket usually costs PLN 100-250, and one with a switch PLN 80-180, depending on the company and region.

How much does an electrician charge per socket?

For a point with a socket, most companies charge PLN 100-250 per point, depending on the city and the complexity of the installation.

How much did you pay for this service?

The quickest way: upload a photo of the receipt or invoice and select a star rating, it takes half a minute. We will read the amount, company and date from the document. The entry will appear immediately. Once confirmed by e-mail, it will receive a yellow "verified: declaration" badge, and once the document has been checked, a green "verified: invoice or receipt" badge.

Both buttons open the same form: you submit the rating yourself. Prefer the full form? How much did you pay?